PENGENALAN PROJEK

Cadangan membina dan menyiapkan
Bangunan Plaza Tol Persimpangan
Bertingkat Kertih Daerah Kemaman,
Terengganu Darul Iman.

MAKLUMAT PENGAWASAN

Pejabat Penyelaras :
Pasukan Projek Lebuhraya Pantai Timur Fasa 2,
Jalan Kemajuan, Bukit Kecil,
Peti Surat No. 52,
20100 Kuala Terengganu.

MAKLUMAT JURUTERA PERUNDING
(PENGAWASAN)

PERUNDING BERSATU
No.9, Jalan SS 15/4C
47500 Subang Jaya
Selangor Darul Ehsan.
MAKLUMAT JURUTERA PERUNDING

Arkitek – i-TAAC ARCHITECT

C&S Engineer – Perunding ZMS Sdn Bhd

M&E Engineer – Jurutera Budiman (M&E)
 Sdn.Bhd

MAKLUMAT KONTRAKTOR
  IZINRIA SDN BHD
  D3A-1, Jalan Execella 2,                     
  Taman Ampang Hilir,
  55100 Kuala Lumpur.

BUTIR-BUTIR KONTRAK
Harga Kontrak               : RM 
Harga Kontrak Semasa  : RM 
Tempoh Asal                 : 65 minggu
Tempoh Sebenar            :        -
Tarikh Milik Tapak          : 24 Feb 2013
Tarikh Siap Asal             : 24 May 2014
Tarikh Siap Sebenar       :       -                                                

 SKOP KONTRAK PLAZA TOL

 KETERANGAN KERJA                     

 Preliminaries
 Appendices To Preliminaries
 Piling Works
 Building Works
  1. Surveillance Building
  2. Toll Canopy
  3. Surau
  4. Toilet
 External Works (ALL PROVISIONAL)
 Traffic Management And Control
 Provisional Sums
 Prime Cost Sums

FAKTA TEKNIKAL

Toll Canopy
6 lorong (365m lebar dan 5.0m lebar – kend berat)
RC pile 250mm x 250mm, 500kN Working Load

Blok Pengawasan (Surveillance Building) 310.2sq.m
RC piles 250mm x 250mm, 500kN working load

Surau 61.60sq.m
Tandas Awam 87.50sq.m
RC piles 250mm x 250mm, 500kN working load

Bangunan Pengawal 23 sq.m
Tapak asas (pad Footing)

Tangki Air Bertingkat
15m tinggi,3000 Gallon HDPE tank
RC piles 250mm x 250mm, 500kN working load

Tempat Letak Kereta Berbumbung (18nos)
Tapak Asas (Pad Footing)

Sistem Bekalan Air
200mm diameter Ductile Iron paip utama
150mm diameter Ductile Iron paip bomba
50mm diameter Poly Pipe paip dalaman
Garis panduan SATU

Sistem Pembentungan
225mm diameter VCP
Aliran gravity

STP
Population Equivalent 200 PE
Package Plant

Jalan
Rigid Pavement
Flexible Pavement